Get a Free Quote

Our representative will contact you soon.
Name
Email
Mobile
Subject
Message
0/1000

Fruit Juice Filling Machine

Fruit juice filling machine preparation system includes: Steam boiler (prepared by customer), hot water system, jacket high shear emulsification tank (high speed), jacket beverage mixing tank (medium speed), double filter, high pressure homogenizer, plate sterilizer, insulation balance tank, drink pump, CIP system, electric control system, connection pipe, cable bridge etc.

Material: stainless steel 304, touching part stainless steel 316. Material offer by ZPSS

Product Gallery

image.png image.png image.png image.png
image.png

Product Video

Technical Specifications

Description

Concentrate juice preparation system is used for making juice from juice concentrate which can be sold in the market. The temperature of final mixed juice is around 85 – 90 degree centigrade. So the juice will be filled into bottles by hot filling machine. Once the filling temperature is lower than 85 – 90 degree centigrade, it will be back to sterilizing machine again.

Application:

Fruit juice filling machine preparation system is used for making juice from juice concentrate which can be sold in the market.

Packaging & Delivery:

All New crown Machines will be packed with high quality plastic film, then put into the wood box increase there is crash and damages.

FAQ:

1, When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered .

2, How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3, What kind payment be accepted by New crown?
A: We can accept L/C,West union,TT

4, How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation,food,and so on.USD 100/DAY/PERSON

Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Newcrown, or we can sent our engineers to help you.

Recommended Products

Get a Free Quote

Our representative will contact you soon.
Name
Phone
Email
Subject
Message
0/1000
Have Questions about Company?

Our professional sales team are waiting for your consultation.

Get a Quote

Get a Free Quote

Our representative will contact you soon.
Name
Email
Mobile
Subject
Message
0/1000